with pole. Once the bracket is secure, mount the charger onto the bracket and ?x it While using the two screws at The underside of the charge stage. Site 15 Installation CT Clamp To monitor the actual-time power import and export, a CT clamp is required for this perform IV. Parameter location to work properly. The CT Clamp is needed to work and use